The construction of a 5 storey educational facility, in the heart of Blackburn town centre was completed with a fully integrated Mechanical and Electrical services installation, the building achieved a BREEAM rating of “Very Good”.

Completed July 2009
Building size: 7,100 m2
Contract value: 2.8 Million

  • Full Design and Project management
  • Photovoltaic Cell Installation
  • Ground Source Heat Pump Installation with bore holes
  • Solar Hot Water Generation System
  • Rain water harvesting system
  • Mains & Boosted Cold Water System
  • Domestic Hot Water System
  • Gas Pipe Work Installation
  • Low Pressure Hot Water Pipe Work System
  • Building Management System
  • General Supply and Extract Ventilation Systems
  • Localised air conditioning systems to high heat gain rooms
  • Lighting installation and small power
  • LV switch panel and sub metering
  • Data cable installation
  • Security system
  • Fire alarm system
  • Door access control
  • Lightning protection