Blackburn College Phase 2, University Centre
The construction of a 5 storey educational facility, in the heart of Blackburn town centre was completed with a fully integrated Mechanical and Electrical services installation, the building achieved a BREEAM rating of “Very Good”.
Completed July 2009
Building size: 7,100 m2
Contract value: 2.8 Million
- Full Design and Project management
- Photovoltaic Cell Installation
- Ground Source Heat Pump Installation with bore holes
- Solar Hot Water Generation System
- Rain water harvesting system
- Mains & Boosted Cold Water System
- Domestic Hot Water System
- Gas Pipe Work Installation
- Low Pressure Hot Water Pipe Work System
- Building Management System
- General Supply and Extract Ventilation Systems
- Localised air conditioning systems to high heat gain rooms
- Lighting installation and small power
- LV switch panel and sub metering
- Data cable installation
- Security system
- Fire alarm system
- Door access control
- Lightning protection